SIZE NUMBER

NOMINAL MAXIMUM

NOMINAL MINIMUM

TYPICAL USE

DENSITY,PCF

(ESTIMATE)

1

3-½”

1-½”

FREE DRAINING HEAVY FILL, ROAD BASE

80-90

2

2-½ ”

1-½"

ROAD BASE, DIFFICULT TO PLACE

100

3

2"

1"

 

100

4

1-½"

¾"

ROAD BASE, EASIER TO PLACE / GRADE

100

57

1"

#4

FREE DRAINING FILL, USED UNDER CONCRETE SLABS

110

67

¾"

#4

 

110

7

½"

#4

 

100-110

8

3/8"

#8

PIPE BEDDING

100-110

9

#4

#16

DRAINAGE BED, SNOW & ICE

120

SAND (#10 MOD)

#4

#100

 

130

3” CRUSHER RUN

3”

#100

DRIVEWAYS, ROADS,

COMPACTION REQUIRED

130

1-½ " CRUSHER RUN

1-1/2"

#100

DRIVEWAYS, ROADS,

COMPACTION REQUIRED

140

¾” CRUSHER RUN

¾"

#100

DRIVEWAYS, ROADS,

COMPACTION REQUIRED

140

RIP-RAP

10"

4"

STREAM BANK PROTECTION

140

SAMPLE CALCULATION:

1.     Determine the volume you require:

Multiply (LENGTH in FEET) x (WIDTH in FEET) x (DEPTH in INCHES) x (0.0833) = VOLUME in CF

2.     Multiply (Cubic Feet (CF)) x (DENSITY (pcf)) = POUNDS REQUIRED

3.     Divide (POUNDS REQUIRED) / (2000 Pounds per Ton) = TONS

4.     Order your stone by the ton. A truck typically hauls 20 tons.